top of page

Drain Leveling 3rd Fairway

  • matthewbehl
  • Apr 1
  • 1 min read

Monday, 3/31 - Curtin and I spent the day leveling the drains at the bottom right and left of the third fairway. These drains had sunk over time and had become a collection area for balls and provided an unfair lie.


Drain before work
Drain before work
Drain after leveling and sodding
Drain after leveling and sodding


In order to level the drains some sod was removed from the 8th white tee. Work to the 8th white tee to include leveling, enlarging, and fixing the tee surround is scheduled to start vey soon. Sod will be stripped off this tee during this process so the decision was made to utilize some of the sod which was a perfect match for the fairway.


Sod removed from the 8th white tee
Sod removed from the 8th white tee



 
 
bottom of page